Kelleher's Logo
Augsburg College Library
Minneapolis, MN
End Use
College Library
Client
Kraus-Anderson / St. Paul Division
Architect
BWBR Architects St. Paul, Minnesota
Perspective
An aesthetically pleasing structure with modern design and detailing. The exterior finish of brick and prefinished panels provides for a low maintenance exterior that complements the campus environment.
Features
A cast-in-place concrete basement with three levels of post-tensioned concrete decking provide the 68,000 square feet of above-ground parking space. The brick exterior with metal composite panels accent the modern design features. The post-tensioned concrete portion of the structure was completed, footing to roof deck, in a fast-track period of 12 weeks.
Augsburg College
Cabela's
Centennial Lakes I, II, III, IV
CSX Little Ferry Terminal
Mills Motors Ford Dealership
Mpls. Federal Courthouse
Stinson Ramp
Under Construction Finished Project
Designed By: Micro Systems Mgmt, Inc.
Under Construction
Finished Project